Top performance with concrete elements

29.07.2019

Wind power towers are the supporting pillars of every wind turbine. They are subjected to great forces during wind power generation and absorb the resulting vibrations via the foundation - a challenge for statics, materials and engineers. At the same time, the annual electricity yield increases by 0.5 to 1 percent with every meter that a wind turbine gains in height. In this respect, the principle often applies at inland locations: the higher the wind turbine, the better the wind shear and thus the yield.

Top performance with concrete elements

 

Concrete-steel combination ideal for large heights

The hybrid towers of Max Bögl Wind AG are ideally suited for wind harvests from a hub height of 140 m and above. The lower part of the towers consists of concrete elements with a steel tube tip at the top. Tubular steel towers of this size are no longer economical because the material and maintenance costs are very high at these heights. Max Bögl Wind AG relies on the concrete strength classes C80/95 to C100/115 for the hybrid towers of the second generation.

 

Concrete from our own house

Max Bögl Wind AG relies on limestone and blastfurnace slag flour from its own production for the formulation of the self-compacting concrete (SCC) used. Thanks to this mixture, it is already possible today to save up to 50 percent of the cement content compared to earlier recipes. An in-house research and development department is working on further increasing the savings potential in the future. In addition to cost savings, the incentive behind this is CO2 reduction in cement production - and thus an even more active contribution to climate protection.

 


Photo: Max Bögl Group

 

Optimized in all areas

In addition to the actual tower concept, the engineers at Max Bögl Wind AG have also optimized the tower foundation, assembly, logistics and interior fittings of the hybrid towers 2.0. The new foundation design simplifies prestressing at the entrance level of the wind turbine and thus streamlines work processes. The horizontal line of the concrete segments, machined with a CNC concrete grinding plant, does not require mortar or adhesive when erecting the hybrid tower. The individual concrete elements can now be transported with standard trailers. Costly heavy transports are completely eliminated. The interior work is carried out using a new patented process: Lift and ladder are installed during the construction of the concrete tower.

 

Excellent and globally successful product

Hybrid towers are also being built in German factory quality far away from home. This is made possible by the innovative Mobile Manufacturing concept. In four halls on an area of 40,000 m² - the equivalent of ten football pitches - all production facilities are accommodated similar to the factory production. Local raw materials and manpower increase the profitability of the project, fewer heavy goods transports protect the infrastructure, the climate and the environment. In Thailand, the first mobile manufacturing project has now been successfully completed. Max Bögl Wind AG erected 90 wind power towers for the Wind farm Thepharak with hub heights of 156.5 m each. The company also won the bauma Innovation Award 2019 in the construction process category for its Mobile Manufacturing division.

 

Advantages of the Hybrid Tower 2.0

  • Tested and proven technology
  • Economical solution made of steel and concrete
  • Maintenance-free concrete tower
  • Transport with standard trailer
  • Short delivery and installation time
  • Local production with mobile manufacturing
  • Long service life of the concrete tower
  • Easy demolition and reusability of the concrete tower segments

 

Ausbildung bei Max Bögl

Bist du kaufmännisch, technisch oder handwerklich interessiert? Für einen Einstieg ins Berufsleben bist du bei uns genau richtig. Wir bilden Azubis in 38 Ausbildungsberufen aus und du kannst einer von ihnen sein. Informiere dich über unsere zahlreichen Ausbildungsberufe und starte mit uns deine Karriere!

Ausbildung bei Max Bögl

Duales Studium bei Max Bögl

Wir bieten jedes Jahr Stellen für die branchenfokussierten Studiengänge Baumanagement, Bauingenieurwesen und Maschinenbau an. Neben einer fundierten wissenschaftlichen Ausbildung kannst du jede Menge Praxiserfahrung sammeln. Außerdem erhältst du einen fließenden Übergang vom Studium in den Beruf. Eine finanzielle Vergütung während dem Studium ist für uns natürlich selbstverständlich.

Duales Studium bei Max Bögl

Schülerpraktikum bei Max Bögl

Du bist noch in der Berufsorientierung und fragst dich, was du nach einem erfolgreichen Schulabschluss machen willst? Wir bieten dir die Möglichkeit, für eine Woche live bei einem unserer Ausbildungsberufe mit dabei zu sein. Finde heraus, was dir Spaß macht!

Schülerpraktikum bei Max Bögl

Bewerbungstipps

Deine Bewerbungsunterlagen sollten Folgendes beinhalten:

  • Anschreiben
  • Aktueller Lebenslauf
  • Letztes Schulzeugnis
  • Nachweis über durchgeführte Praktika (wenn vorhanden)

 

Bewerbungstipps - Video

Bewerbungstipps

Ferienjobs

Während der Schulferien etwas dazuverdienen und gleichzeitig das Unternehmen kennenlernen. Ferienjobs gibt es in verschiedenen Bereichen von Max Bögl, wie z.B. in der Fertigung oder der Logistik. Finde innerhalb von 1 bis 8 Wochen heraus, wo deine Interessen liegen. Entdecke die Welt von Max Bögl!

Ferienjobs

Benefits für Schüler

Diese Webseite verwendet Cookies. Indem Sie unsere Webseite nutzen, stimmen Sie der Verwendung von Cookies zu. Mehr erfahren ...