20.04.2018

25 years for four hours.

Over ten billion euros in construction costs, 25 years of planning and construction time: With the opening of Europe's largest and most expensive rail project, the Berlin-Munich high-speed line, Germany has been moving closer together since the end of last year. Thanks to a record travel time of just under four hours, from city centre to city centre, Deutsche Bahn wants to inspire travellers and encourage them to change from airplanes to trains.

High-speed route Berlin-Munich

Germany's most modern high-speed line was officially opened on 8 December 2017 with two special trains travelling and a major ceremony in Berlin in the presence of Federal Chancellor Angela Merkel, Federal Minister Christian Schmidt and several heads of state governments. Exactly 623 kilometres (via Halle) and 652 kilometres (via Leipzig) lie between the main stations of the German capital and the Bavarian metropolis. The ICE Sprinter, which stops three times a day on its way only in Halle, Erfurt and Nuremberg, shortens the travel time by a third from six hours to 3:55 hours. By way of comparison, the regular ICE can cover the distance in 4:30 hours.

 

Closing the gap in the European high-speed rail network

With a top speed of up to 300 km/h, the ICEs are on the move on sections of the newly built sections. At the heart of the new section that has now gone into operation, a nearly 110 kilometer long section through Thuringia, 22 tunnels and 27 viaducts were built. In addition to the national advantages, this high-speed line also brings Europe's North and South a little closer: it is an important component of the Trans-European Transport Networks (TEN-T) and, thanks to a common train control system, will make it possible in future to travel across national borders without changing railcars and without intermediate stops.

Milestones for Max Bögl

Together with the new Nuremberg-Ingolstadt-Munich line, the transport project German Unity No. 8 (VDE 8) with the new construction and extension of the lines between Nuremberg, Erfurt, Halle, Leipzig and Berlin is a project of superlatives. In 1991, after the reunification of Germany, the Federal Government decided that the new turbo line should sustainably improve the rail connections for passenger and freight traffic. The Max Bögl Group also played a major role in the implementation of this infrastructure measure, providing difficult engineering, tunneling and civil engineering services for the following sections:

NBS Nürnberg-Ingolstadt, Los Nord (35 km) between Feucht and Greding:

  • Turnkey construction of the line section up to OK Rail incl.
  • Göggelsbuch tunnel (2,287 m) and open construction (1,330 m)
  • Construction of various earthworks and bridges
  • Ballastless track system Bögl

news 2018 schnellfahrstrecke berlin muenchen 02 max boegl

NBS Ebensfeld–Erfurt (107 km):

  • Tunnels: Finnetunnel (6,886 m), Silberberg (7,391 m), Brandkopf (1,494 m) and Lohmeberg (688 m)
  • Railway bridges over the Wohlrose valley and Schobsetal

news 2018 schnellfahrstrecke berlin muenchen 03 max boegl

NBS Ebensfeld-Erfurt, Erfurt-Ilmenau section (32.5 km):

  • Permanent way in slab track Bögl
  • Noise barriers system Bögl

news 2018 schnellfahrstrecke berlin muenchen 04 max boegl

NBS Nuremberg-Ebensfeld (infrastructure measures Bubenreuth)

  • Earthworks, substructure: 352,220 m³
  • Drainage: 8,124 m
  • Diffusers: 305 m
  • shafts: 261 pieces up to max. 8 m depth
  • Provisional platforms: 1,200 m²
  • Overpasses: 13,000 m³ concrete, 10,000 m drilled piles, 7,000 m² sheet piles

Lean management is voor Max Bögl meer dan alleen maar een methode. Het is namelijk ons doel onze bedrijfsfilosofie blijvend te veranderen en een lerende organisatie met een lean-cultuur te creëren. In het kader van deze filosofie worden handelingsprincipes, zoals veranderings-, waarden- en foutencultuur verondersteld en ook geaccepteerd. De lean-principes zijn een hulpmiddel op onze weg naar een slank bouwbedrijf. De implementatie van de lean principes wordt uitgevoerd door dagelijks gebruik van de methoden en instrumenten door onze medewerkers.

Een beslissende factor op weg naar een slank bouwbedrijf zijn de medewerkers van de groep omdat zij als experts op hun werkplek een belangrijke rol bij de verandering vervullen. Om ze op de komende veranderingen voor te bereiden en hun de noodzakelijke kennis over te dragen werd de maxlean Academie opgericht. Doel is om met een vier-fasen opleidingsconcept onze collega's met de voor hen noodzakelijke knowhow toe te rusten. Ze worden door scholingen en door coaching ter plekke ondersteund om zo de lean-cultuur te leren kennen en die in hun dagelijkse werk toe te passen. De scholingen worden door simulaties ondersteund om zo de geleerde theorie aan de hand van praktische voorbeelden te intensiveren. Hierbij is de leerinhoud en het praktijkgedeelte afgestemd op de taakvelden van onze collega's om zo de praktische toepassing in het alledaagse werk te vergemakkelijken. De praktische toepassing en coaching ter plekke vinden plaats door de opgebouwde lean-structuur op de betreffende vakgebieden.

maxlean beperkt zich niet alleen tot één sector van ons bedrijf. Integendeel, Lean moet als uniforme aanpak worden gezien, waarbij aan onze hele keten waarde wordt toegevoegd. Binnen de Max Bögl -groep zien we lean management niet als begrensd, maar geïntegreerd in onze algehele strategie ‚Fortschritt 4.0‘. Daarbij kijken we zowel naar de productie en de bouwplaats maar ook naar de logistiek en administratieve disciplines om onze klanten de gevraagde diensten te verlenen.

This website uses cookies. By using our website, you consent to the use of cookies. Learn more ...