Cutting-edge technology in the SMB portfolio

21.10.2019

The company SMB Construction International GmbH has emerged from many years of trustful cooperation with the partner STRABAG through the construction of test sites for automobile development as well as high-speed railways with elevated curves. In this special segment of road construction, sophisticated construction techniques and innovative equipment are used to meet the high demands of the automotive industry.

Cutting-edge technology in the SMB portfolio

 

Especially in the construction of high-speed railways with parabolically shaped steep curves up to 49° cross slope and 115 % gradient, SMB has done pioneering work with the use of the steep curve paver. A technically well trained and highly motivated team of employees and meticulous project preparation are among the outstanding strengths of the company. The early competent consulting of clients and planners is an integral part of the comprehensive service package.

 

pm 2019 grossauftrag erdverkabelungPhoto: Jürgen Wisckow

 

Test and training tracks at the highest level Building on years of experience in the construction of large test and training tracks for the automotive industry, SMB also deals with the planning and implementation of driving safety centers. Thanks to an extraordinary road design with difficult surfaces, condition sections and controllable obstacles, the extreme driving sections of these centres test and train the drivers' dexterity at the wheel. SMB has extensive know-how and experience from a large number of projects that have been successfully implemented for renowned customers worldwide.

 

news 2019 smb 03 max boegl
Klaus Görgner
Managing Director SMB Construction International
"With our know-how in the construction of modern test tracks, we are the global market leader and reliable partner of the automotive industry. 49° is too hot for many, but not too steep for us: SMB."

 

Current Projects

  • Renovation of the circuit Nardò, Italy (AG: Nardò Technical Center, Porsche)
  • New construction of 2 steep curves on the Zhongya Tyre Proving Ground, China (AG: Zhongya Tyre)
  • New construction of 2 steep curves on the Proving Ground in Santa Cruz de la Zarza, Spain (AG: Nokian Tyres)

 

 

pm 2019 grossauftrag erdverkabelungPhoto: Jürgen Wisckow

 

Range of Services

  • Planning and consulting
  • Construction of test and race tracks
  • Construction of driving safety centres
  • Construction of round and oval tracks
  • Construction of state sections
  • Construction of parabolically shaped steep curves
  • Machine technology: Bridge paver / steep curve paver

 

Op de max landkaart wordt het complete proces van de projectuitvoering weergegeven: van de acquisitiefase tot het eind van de garantiefase. De focus ligt daarbij op de voorbereidende werkzaamheden om fouten bij de latere uitvoering te voorkomen waardoor op kosten wordt bespaard en de kwaliteit en naleving van termijnen wordt gegarandeerd. Door de vrijgave van de mijlpalen van de ene fase naar de volgende beperken we bij de projectafwikkeling het risico tot een minimum en voorkomen we dat capaciteiten verkeerd worden gebruikt.

Typische resultaten van gestandaardiseerde projectafwikkeling zijn een grotere efficiency bij de uitvoering, de aansturing van complexe projecten, het terugbrengen van herhalingen, achteraf uit te voeren werkzaamheden en nieuwe planningen waardoor de projectvoortgang wordt versneld. Daarnaast wordt door een duidelijke verdeling van taken, bevoegdheden en verantwoordelijkheden een betere controle en meer transparantie gerealiseerd ondanks de vele bij het project betrokken partijen. Terwijl de interdisciplinaire vormgeving van het projectteam voor voldoende en veelzijdige expertise zorgt, wordt de uniforme planning en aansturing van het project door de geregelde betrokkenheid van het projectmanagement gewaarborgd.

Door middel van een drie-fasen commissiestructuur – bestaande uit het projectteam, de aansturings- en controlegroep – wordt een betere ondersteuning bij projecten en een snellere besluitvorming mogelijk gemaakt. Op grond van het verleggen van beslissingsbevoegdheden naar lagere niveaus (topdown) wordt de focus verlegd naar slechts een paar belangrijke beslissingen en wordt op die manier het management ontlast.

This website uses cookies. By using our website, you consent to the use of cookies. Learn more ...