Modular building has many facets:

In Manching near Ingolstadt, a residential complex with 115 apartments including an underground car park is being built under the aspect of responsible redensification. The client GBW opted for the maxmodul construction system from Max Bögl, which intelligently complements economic and ecological aspects.

New residential quarter in Manching

 

The sustainably designed residential building on Ingolstädter Strasse is divided into six L-shaped individual buildings with four or five storeys and a wide variety of floor plans. The apartment types range from a 3-module single apartment to a 4-room apartment with balcony or (roof) terrace. In the course of the attractive residential building project with around 7,400 square metres of living space, five children's playgrounds and spacious green areas will be built on the former garage courtyard.

 

 

Holistic planning and construction execution

The architectural planning was carried out by BLAUWERK Architekten from Munich. The construction method in the maxmodul system, the choice of materials and the redesign of the living environment were specified and elaborated in consultation with the architect's office and the client in the bidding, planning and execution process.

In addition to all structural and design considerations, a contemporary modular construction project should have the aim of harmonising resources and resources, people and the environment and implementing socio-economic themes. The holistic planning and execution of all facets of maxmodul's construction projects is a complex undertaking - but a forward-looking way of achieving economic and social goals for buildings and projects worth living in.

 

 

Fast, efficient and digital

Through continuous improvement, digital planning and efficient construction, it has been possible to improve the planning quality and increase the efficiency of module and wet cell production in the company's own plant as well as on the construction site. This means that thanks to the database-driven planning and parts lists, information can reach the right contact persons quickly and promptly. Components arrive on time and just in time at the respective workplace in the modern construction factory or on the construction site. The introduction of this system initially required additional effort on the part of all involved. From the hardware and software to the qualification of the employees to the maintenance of the digital model, all work processes had to be decisively changed - a real "cultural change" was necessary at maxmodul.

With the GBW Manching project, the digitisation process at Max Bögl became an integral part of planning and execution at the plant and on the construction site. Cooperative work - from industrial production to assembly - requires all data to be compatible with each other. Here, the project shows that completely new possibilities for planning and building the future are already opening up.

 

 

Systematisiert im Bau. Vielfältig in der Gestaltung.

 

Effizienz zieht sich bei uns durch alle Projektphasen des systematisierten Industriebaus. Für Gewerbeimmobilien hat die Firmengruppe Max Bögl ein System entwickelt, das Zeit und Kosten spart und gleichzeitig ausreichend Freiraum für individuelle Anforderungen lässt. Die Konstruktion der Hallenbauten erfolgt mittels einer flexiblen Zusammensetzung individuell angepasster Bauteile. Die jeweiligen Bestandteile – wie Stützen, Unterzüge oder Dachbinder – entstammen sozusagen einem Baukasten-System, passen stets präzise ineinander und lassen sich beliebig miteinander verbinden und erweitern. Auch die Realisierung mehrstöckiger Immobilien ist damit kein Problem.

Zudem können wir dank dieser Methode Bauteile in höchster Präzision und Qualität fertigen. Alle Arbeitsabläufe werden stets sorgfältig und zuverlässig geplant, sodass jeder Handgriff zur passenden Zeit und an der richtigen Stelle vorgenommen wird. Diese Optimierung ermöglicht einen nachhaltigen Bauprozess, da die benötigte Energie für die Produktion bestmöglich eingesetzt wird.

ln der gewinnbringenden Anwendung des digitalen Bauens besitzt Max Bögl die Marktführerschaft in Deutschland und ist dafür bereits mehrfach ausgezeichnet worden. Schließlich erreichen wir umfassende Effizienz und Qualität durch klare und eindeutige Grundsätze, die wir bei Max Bögl im systematisierten lndustriebau anwenden.

Systematisiert im Bau. Vielfältig in der Gestaltung.

Ganzheitliche Lösungen

Neben der Ausführung der reinen Bauleistung bietet Max Bögl auch die Beratung und Planung über alle Projektphasen hinweg an. So können Sie Ihre Halle gemeinsam mit unseren Experten individuell konfigurieren und an Ihre speziellen Bedürfnisse anpassen.

  • Bedarfsanalyse
  • Entwurfsplanung
  • Detailplanung
  • Angebot
  • Vertragsunterzeichnung
  • Baustart
  • Fertigstellung

 

Ganzheitliche Lösungen

Vorteile des Hallensystems Bögl

Unsere Referenzen – Ihre Inspiration

blank

Kiekebusch

Logistikzentrum Septima

mehr Infos
blank

Kelsterbach

Logistikzentrum Immogate

mehr Infos
blank

Oelde

Logistikzentrum Gazeley

mehr Infos
blank

Mannheim

Schwerlastverladehalle Kübler

mehr Infos
blank

Gera

Produktionshalle Stahlo

mehr Infos
blank

Poing

Logistikzentrum Schustermann & Borenstein

mehr Infos

Diese Webseite verwendet Cookies. Indem Sie unsere Webseite nutzen, stimmen Sie der Verwendung von Cookies zu. Mehr erfahren ...