General renovation of Munich grammar schools

13.06.2019

Venerable, but in need of restoration.

The growing population, full-day care and the reintroduction of the G9 at the grammar schools prompted the City of Munich to launch an extensive expansion programme until 2030 as part of the school construction offensive. In addition to new buildings of various school types, educational institutions must also be repaired and expanded.

General renovation of Munich grammar schools

 

Close to Münchner Freiheit in the Schwabing district, the state capital is planning the general overhaul and expansion of the Oskar-von-Miller-Gymnasium and the Maximiliansgymnasium. Both were built before World War I and share a horseshoe-shaped building complex. After the Second World War, the venerable school building had to be rebuilt and comprehensively renovated at the end of the 1970s.

 

Building in historical ambience

While preserving the historical building fabric, the technical building equipment and the entire static load-bearing system of the listed existing building will be renewed over the next four years. The challenges include the replacement of ceilings, the installation of a new roof construction and the strengthening of the foundation by underpinning. In addition, the inner courtyard will be put to maximum use by installing an underground gymnasium and an extension building as a specialist class wing.

 

news 2019 sanierung muenchen 02 max boegl
Photo: Michael Stibitz

 

Complex shoring works

As technical leader in Arge, the Max Bögl Group was commissioned with extensive special civil engineering, drainage and earthworks. The main trades are jet grouting and large bored pile work. A back-anchored excavation pit with bracing base in the former gymnasium is being constructed by means of jet blasting for the new construction of an underground ventilation centre. This technology will also be used to underpin the strip foundations of the building wings and the head structures of both grammar schools. The new gymnasium and extension buildings will be constructed in excavation pits surrounded by simply back-anchored, overlapping pile walls. The existing groundwater levels, in conjunction with the depth of the gymnasium, require a lift protection with micropiles and a lowering of the groundwater level.

 

Three-layer excavation pit

Progressive explosive ordnance soundings, additional temporary steel girder structures with wood infill, low-pressure injection work and various steel girder frames are to be integrated into the work process. The special civil engineering works are supplemented by the excavation of the three-layer subsoil from filling, quaternary gravel as well as tertiary clays/slides and sands. After thorough analysis, the excavated material is sent to a qualified, proven disposal facility. The construction period for the complex remediation work extends from September 2018 to November 2020 - with a core construction period between October 2018 and May 2020.

 

Systematisiert im Bau. Vielfältig in der Gestaltung.

 

Effizienz zieht sich bei uns durch alle Projektphasen des systematisierten Industriebaus. Für Gewerbeimmobilien hat die Firmengruppe Max Bögl ein System entwickelt, das Zeit und Kosten spart und gleichzeitig ausreichend Freiraum für individuelle Anforderungen lässt. Die Konstruktion der Hallenbauten erfolgt mittels einer flexiblen Zusammensetzung individuell angepasster Bauteile. Die jeweiligen Bestandteile – wie Stützen, Unterzüge oder Dachbinder – entstammen sozusagen einem Baukasten-System, passen stets präzise ineinander und lassen sich beliebig miteinander verbinden und erweitern. Auch die Realisierung mehrstöckiger Immobilien ist damit kein Problem.

Zudem können wir dank dieser Methode Bauteile in höchster Präzision und Qualität fertigen. Alle Arbeitsabläufe werden stets sorgfältig und zuverlässig geplant, sodass jeder Handgriff zur passenden Zeit und an der richtigen Stelle vorgenommen wird. Diese Optimierung ermöglicht einen nachhaltigen Bauprozess, da die benötigte Energie für die Produktion bestmöglich eingesetzt wird.

ln der gewinnbringenden Anwendung des digitalen Bauens besitzt Max Bögl die Marktführerschaft in Deutschland und ist dafür bereits mehrfach ausgezeichnet worden. Schließlich erreichen wir umfassende Effizienz und Qualität durch klare und eindeutige Grundsätze, die wir bei Max Bögl im systematisierten lndustriebau anwenden.

Systematisiert im Bau. Vielfältig in der Gestaltung.

Ganzheitliche Lösungen

Neben der Ausführung der reinen Bauleistung bietet Max Bögl auch die Beratung und Planung über alle Projektphasen hinweg an. So können Sie Ihre Halle gemeinsam mit unseren Experten individuell konfigurieren und an Ihre speziellen Bedürfnisse anpassen.

  • Bedarfsanalyse
  • Entwurfsplanung
  • Detailplanung
  • Angebot
  • Vertragsunterzeichnung
  • Baustart
  • Fertigstellung

 

Ganzheitliche Lösungen

Vorteile des Hallensystems Bögl

Unsere Referenzen – Ihre Inspiration

blank

Kiekebusch

Logistikzentrum Septima

mehr Infos
blank

Kelsterbach

Logistikzentrum Immogate

mehr Infos
blank

Oelde

Logistikzentrum Gazeley

mehr Infos
blank

Mannheim

Schwerlastverladehalle Kübler

mehr Infos
blank

Gera

Produktionshalle Stahlo

mehr Infos
blank

Poing

Logistikzentrum Schustermann & Borenstein

mehr Infos

Diese Webseite verwendet Cookies. Indem Sie unsere Webseite nutzen, stimmen Sie der Verwendung von Cookies zu. Mehr erfahren ...