Top performance with concrete elements

29.07.2019

Wind power towers are the supporting pillars of every wind turbine. They are subjected to great forces during wind power generation and absorb the resulting vibrations via the foundation - a challenge for statics, materials and engineers. At the same time, the annual electricity yield increases by 0.5 to 1 percent with every meter that a wind turbine gains in height. In this respect, the principle often applies at inland locations: the higher the wind turbine, the better the wind shear and thus the yield.

Top performance with concrete elements

 

Concrete-steel combination ideal for large heights

The hybrid towers of Max Bögl Wind AG are ideally suited for wind harvests from a hub height of 140 m and above. The lower part of the towers consists of concrete elements with a steel tube tip at the top. Tubular steel towers of this size are no longer economical because the material and maintenance costs are very high at these heights. Max Bögl Wind AG relies on the concrete strength classes C80/95 to C100/115 for the hybrid towers of the second generation.

 

Concrete from our own house

Max Bögl Wind AG relies on limestone and blastfurnace slag flour from its own production for the formulation of the self-compacting concrete (SCC) used. Thanks to this mixture, it is already possible today to save up to 50 percent of the cement content compared to earlier recipes. An in-house research and development department is working on further increasing the savings potential in the future. In addition to cost savings, the incentive behind this is CO2 reduction in cement production - and thus an even more active contribution to climate protection.

 


Photo: Max Bögl Group

 

Optimized in all areas

In addition to the actual tower concept, the engineers at Max Bögl Wind AG have also optimized the tower foundation, assembly, logistics and interior fittings of the hybrid towers 2.0. The new foundation design simplifies prestressing at the entrance level of the wind turbine and thus streamlines work processes. The horizontal line of the concrete segments, machined with a CNC concrete grinding plant, does not require mortar or adhesive when erecting the hybrid tower. The individual concrete elements can now be transported with standard trailers. Costly heavy transports are completely eliminated. The interior work is carried out using a new patented process: Lift and ladder are installed during the construction of the concrete tower.

 

Excellent and globally successful product

Hybrid towers are also being built in German factory quality far away from home. This is made possible by the innovative Mobile Manufacturing concept. In four halls on an area of 40,000 m² - the equivalent of ten football pitches - all production facilities are accommodated similar to the factory production. Local raw materials and manpower increase the profitability of the project, fewer heavy goods transports protect the infrastructure, the climate and the environment. In Thailand, the first mobile manufacturing project has now been successfully completed. Max Bögl Wind AG erected 90 wind power towers for the Wind farm Thepharak with hub heights of 156.5 m each. The company also won the bauma Innovation Award 2019 in the construction process category for its Mobile Manufacturing division.

 

Advantages of the Hybrid Tower 2.0

  • Tested and proven technology
  • Economical solution made of steel and concrete
  • Maintenance-free concrete tower
  • Transport with standard trailer
  • Short delivery and installation time
  • Local production with mobile manufacturing
  • Long service life of the concrete tower
  • Easy demolition and reusability of the concrete tower segments

 

Stageplekken

Voor onze projecten zijn wij continu op zoek naar enthousiaste stagiair(e)s.

Max Bögl biedt studenten Civiele Techniek of vergelijkbare opleidingen de kans om hun talenten te ontplooien.

Stageplekken

Wat bieden wij?

Wij bieden je een leuke en uitdagende stage aan met een interessante en leerzame werkomgeving, waar je ruimte voor eigen initiatieven krijgt. De werkzaamheden zijn uitlopend op het gebied van uitvoering en werkvoorbereiding. Tijdens de stage krijg je een eigen begeleider waar je nauw mee samenwerkt en maak je kennis met al onze mensen, waarbij je natuurlijk ook altijd met vragen terecht kunt. HBO stagiairs ontvangen € 550,-- bruto per maand op basis van 40 uur per week. Redenen genoeg om eens te komen praten?

Wat bieden wij?

Wie zoeken wij?

Een stagiaire op HBO niveau, studie in de civiele bouwsector die gedurende circa 5 maanden kan assisteren bij diverse werkzaamheden op de locatie. Voor ons project zijn niet alleen technische kennis een vereiste, maar ook creativiteit en enthousiasme. Tevens beschik je over organisatorische kwaliteiten, goede communicatieve uitdrukkingsvaardigheid, goede kennis van MS-office, Excel en AutoCad.

Wie zoeken wij?

De duur van de stage?

Voor de periode van circa vijf maanden. Je bent minimaal 20 uur per week beschikbaar. De dagen worden in onderling overleg ingevuld.

Heb je interesse of wil je meer informatie? Solliciteer snel!
Je motivatie en CV kun je opsturen naar dit adres:

Max Bögl Nederland B.V.
Afdeling Personeelszaken
Postbus 94178
1090 GD  AMSTERDAM
Tel. +31 (0) 20 3981130
E-mail: amelis@nl.max-boegl.com

De duur van de stage?

Werkstudent

Vind jij het leuk om naast je studie al praktijkervaring op te doen? Wij bieden je die mogelijkheid.

Max Bögl biedt onder andere studenten Civiele Techniek of vergelijkbare opleidingen de kans om hun talenten te ontplooien, maar ook bij ondersteunende afdelingen zoals de financiële administratie kun je aan de slag.

Heb je interesse of wil je meer informatie? Solliciteer snel!
Je motivatie en CV kun je opsturen naar dit adres:

Max Bögl Nederland B.V.
Afdeling Personeelszaken
Postbus 94178
1090 GD  AMSTERDAM
Tel. +31 (0) 20 3981130
E-mail: amelis@nl.max-boegl.com

Werkstudent

Video

This website uses cookies. By using our website, you consent to the use of cookies. Learn more ...