Process optimization in road construction

13.04.2017

Logistics software BPO successfully introduced. Work on the new bypass of the B 312 federal highway in Reutlingen has been underway since June 2012.

Process optimization in road construction

In May 2016, the asphalt road surface was paved in the Scheibengipfel tunnel under the "Achalm". A premiere for Max Bögl: Because the paving was carried out according to the principles of road construction 4.0 - using the construction process management software BPO Asphalt. With the real-time system "BauProzessOptimierung", or BPO for short, the Max Bögl Group hopes to improve control of the entire asphalt paving process and logistics from production to delivery and paving - and thus optimize the entire construction process.

Die nachfolgende Umweltrichtlinie dient allen Beschäftigten der Firmengruppe Max Bögl als Orientierung und Leitlinie im betrieblichen Umweltschutz. In dem Dokument sind unsere firmenweiten Verpflichtungen und Ziele zu den jeweiligen Umwelthemen hinterlegt. Gleichzeitig stellt die Richtlinie unseren Anspruch an alle unsere Partner wie Lieferanten, Nachunternehmen oder Arbeitsgemeinschaftspartnern dar.

 

Umweltrichtlinie

 

Diese Webseite verwendet Cookies. Indem Sie unsere Webseite nutzen, stimmen Sie der Verwendung von Cookies zu. Mehr erfahren ...