In May 2016, the asphalt road surface was paved in the Scheibengipfel tunnel under the "Achalm". A premiere for Max Bögl: Because the paving was carried out according to the principles of road construction 4.0 - using the construction process management software BPO Asphalt. With the real-time system "BauProzessOptimierung", or BPO for short, the Max Bögl Group hopes to improve control of the entire asphalt paving process and logistics from production to delivery and paving - and thus optimize the entire construction process.
Modulbrücke Bögl
Process optimization in road construction
						  											
									
																									
									
										13.04.2017									
															
					  	Logistics software BPO successfully introduced. Work on the new bypass of the B 312 federal highway in Reutlingen has been underway since June 2012.
 
							
            					
						
											
 
	 
				 
				