General renovation of Munich grammar schools

13.06.2019

Venerable, but in need of restoration.

The growing population, full-day care and the reintroduction of the G9 at the grammar schools prompted the City of Munich to launch an extensive expansion programme until 2030 as part of the school construction offensive. In addition to new buildings of various school types, educational institutions must also be repaired and expanded.

General renovation of Munich grammar schools

 

Close to Münchner Freiheit in the Schwabing district, the state capital is planning the general overhaul and expansion of the Oskar-von-Miller-Gymnasium and the Maximiliansgymnasium. Both were built before World War I and share a horseshoe-shaped building complex. After the Second World War, the venerable school building had to be rebuilt and comprehensively renovated at the end of the 1970s.

 

Building in historical ambience

While preserving the historical building fabric, the technical building equipment and the entire static load-bearing system of the listed existing building will be renewed over the next four years. The challenges include the replacement of ceilings, the installation of a new roof construction and the strengthening of the foundation by underpinning. In addition, the inner courtyard will be put to maximum use by installing an underground gymnasium and an extension building as a specialist class wing.

 

news 2019 sanierung muenchen 02 max boegl
Photo: Michael Stibitz

 

Complex shoring works

As technical leader in Arge, the Max Bögl Group was commissioned with extensive special civil engineering, drainage and earthworks. The main trades are jet grouting and large bored pile work. A back-anchored excavation pit with bracing base in the former gymnasium is being constructed by means of jet blasting for the new construction of an underground ventilation centre. This technology will also be used to underpin the strip foundations of the building wings and the head structures of both grammar schools. The new gymnasium and extension buildings will be constructed in excavation pits surrounded by simply back-anchored, overlapping pile walls. The existing groundwater levels, in conjunction with the depth of the gymnasium, require a lift protection with micropiles and a lowering of the groundwater level.

 

Three-layer excavation pit

Progressive explosive ordnance soundings, additional temporary steel girder structures with wood infill, low-pressure injection work and various steel girder frames are to be integrated into the work process. The special civil engineering works are supplemented by the excavation of the three-layer subsoil from filling, quaternary gravel as well as tertiary clays/slides and sands. After thorough analysis, the excavated material is sent to a qualified, proven disposal facility. The construction period for the complex remediation work extends from September 2018 to November 2020 - with a core construction period between October 2018 and May 2020.

 

Die Stoffkreisläufe sollen möglichst geschlossen und Schadstoffe ausgeschleust werden, damit Abfälle der Wirtschaft wieder als Sekundärrohstoffe zur Verfügung gestellt werden. Abfälle sind wertvolle Rohstoffe, die effektiv genutzt werden können, um natürliche Ressourcen zu schonen. Um Beeinträchtigungen des Wohls der Allgemeinheit zu verhindern, sind in der Deponieverordnung ergänzende Vorschriften für die Ablagerung von Reststoffen und die Ausbildung der Abdichtungssysteme geregelt. Im Sinne einer intakten Umwelt sind technisch anspruchsvolle Bauwerke erforderlich, die den strengen Anforderungen der Qualitätssicherung und des Arbeitsschutzes genügen.

Leistungsspektrum

  • Deponiebau
  • Umwelttechnik
  • Oberflächenabdichtung
  • Basisabdichtung
  • Sanierung Sickerwasserleitung
  • Entgasung
  • Stoffstrommanagement
Leistungsspektrum

Diese Webseite verwendet Cookies. Indem Sie unsere Webseite nutzen, stimmen Sie der Verwendung von Cookies zu. Mehr erfahren ...