New construction of the exhibition hall 3C

NürnbergMesse shines with world architecture.

NürnbergMesse is writing another major chapter in its success story. What began in 2014 with the inauguration of Hall 3A will be provisionally completed at the end of 2018 with the completion of the new Hall 3C building. In future, the visionary architecture of Zaha Hadid will characterise the exhibition grounds of the Franconian metropolis not only in the south-east but also in the south-west.

New construction of the exhibition hall 3C

 

Modern and functional: With the new Hall 3C, Zaha Hadid Architects continue the striking triangular supporting structure of their architectural twin, Hall 3A - but in much larger dimensions. Instead of 95 metres in length, the trapezoidal exhibition building with its ground plan, which unmistakably bears the signature of the star architect and winner of the Pritzker Prize, who died in 2016, will be up to 145 metres long - with the same width of 85 metres. The 10,200 square metre roof construction drops from a height of 20 metres to 13 metres to the south with an inclination of four degrees. In addition to acoustic advantages, this slight roof pitch offers thermal and energetic advantages. Glass facades reaching down to the ground on the south side of the exhibition hall allow plenty of daylight to flood into the enormous interior with around 9,600 square metres of exhibition space.

news 2018 nuernberg messehalle 3c 02 max boegl

Visionary design in the Franconian metropolis

Since the ground-breaking ceremony in April 2016, Max Bögl has played a major role in the future of the exhibition in Nuremberg. The Max Bögl Group commissioned for the complex shell and steel construction work is repeating the successful cooperation with the NürnbergMesse builder-owner, as with the predecessor buildings 3A and 4A. The construction of Hall 3C will not only create another architectural milestone that is intended to attract even more visitors and exhibitors to the metropolitan region. The new building will also serve as a "buffer hall" to compensate for the loss of exhibition space in future renovations of the existing halls, which are up to 40 years old.

news 2018 nuernberg messehalle 3c 03 max boegl

Precision lifting of the steel three-belt trusses

The enormous interior of the extravagant corner building is characterised by wave-shaped beams in the area of the steel space truss truss roof structure. Up to four metre high three-belt trusses with widening and swivelling bottom chords span the entire width of the hall without columns. Due to their enormous dimensions, the impressive three-belt trusses were transported to the construction site exclusively at night by their own special vehicles. The 3D-based plant and assembly planning as well as the production of the large segments in the steel structure at the Sengenthal headquarters posed a special challenge to the steel structure experts at Max Bögl.

Tree supports with striking fan structure

On the construction site, two mobile cranes in tandem lift ensured that even the largest steel girders weighing up to 50 tons were lifted precisely and anchored securely to the external supports. The architectural highlight of the exhibition hall is the pointed arch of these steel columns, which converge at the top and grow out of the interior like treetops with their fanned out branch structures. The steel "tree supports" are also manufactured in a complex process in the steel structure of the group of companies.

news 2018 nuernberg messehalle 3c 04 max boegl

Another milestone in steel construction assembly

Until completion at the end of 2018, around 2,300 tonnes of steel and 3,000 square metres of glass will be installed in the technically challenging Hall 3C, among other things. The challenging part of the construction task currently follows in the area of the inclined west façade with the "ship's bow beams" not yet installed in Hall 3A. These are three-belt trusses tapering to the south, whose lower and upper chords meet at a common point in the upper chord level. The main assembly of the steel structure is scheduled for completion in October of this year.

Ganzheitliche Lösungen

Neben der reinen Bauleistung bei Hallen mit bestehender Ausführungsplanung bietet Max Bögl auch die Beratung und Planung über alle Projektphasen hinweg an. Sie können Ihre Halle so mit unseren Experten individuell konfigurieren und an Ihre speziellen Bedürfnisse anpassen.

  • Bedarfsanalyse
  • Entwurfsplanung
  • Detailplanung
  • Angebot
  • Vertragsunterzeichnung
  • Baustart
  • Fertigstellung
  • Nachgelagerter Service
Ganzheitliche Lösungen

Systematisiert im Bau. Vielfältig in der Gestaltung.

Effizienz zieht sich bei bei uns durch alle Projektphasen des systematisierten Industriebaus. Für die Realisierung von Data Centern wendet die Firmengruppe Max Bögl ein System der Vorfertigung an, das Zeit und Kosten spart und gleichzeitig ausreichend Freiraum für individuelle Anforderungen lässt.

Die Konstruktion erfolgt mittels einer flexiblen Zusammensetzung individuell angepasster Bauteile aus vorgefertigten Stützen, Unterzügen, Bindern und Deckenplatten. Die jeweiligen Bestandteile, die sozusagen einem Baukasten-System entspringen, passen stets präzise ineinander und lassen sich für den Potentialausgleich sowie den EMV-Schutz optimal miteinander verbinden und erweitern.

Zudem können wir dank dieser Methode Bauteile in höchster Präzision und Qualität sowie unter Einhaltung höchster Arbeitssicherheitsstandards fertigen. Alle Arbeitsabläufe werden stets sorgfältig und zuverlässig geplant, sodass jeder Handgriff zur passenden Zeit und an der richtigen Stelle vorgenommen wird. Die Arbeitssicherheit und Gesundheit aller Beteiligten steht dabei selbstverständlich immer an erster Stelle.

lm gewinnbringenden Einsatz des digitalen Bauens besitzt Max Bögl die Marktführerschaft in Deutschland und ist dafür bereits mehrfach ausgezeichnet worden. Schließlich erreichen wir umfassende Effizienz und Qualität durch strenge Grundsätze, die wir bei Max Bögl im systematisierten lndustriebau anwenden.

Systematisiert im Bau. Vielfältig in der Gestaltung.

Transparenz von Anfang an

Durch unsere digitale Planung mit Building lnformation Modeling (BlM) liefern wir Ihnen von Anfang an ein genaues Bild des gesamten Bauprojekts. Diese software-basierte Planung gibt nicht nur Aufschluss über die Abmessung des Gebäudes, sondern auch über Kosten- und Zeitplanung. Wenn Sie während der Bauphase Anpassungen in Erwägung ziehen, erhalten Sie punktgenaue Informationen über etwaige Konsequenzen. So wissen Sie zu jedem Zeitpunkt über alle Details lhres Projektes Bescheid.

Transparenz von Anfang an

Vorteile des Generalunternehmens Bögl

  • Full-Service-Angebot von der ersten Idee bis zur fertigen Immobilie
  • Integrale Planung mit Fachexperten aus den entsprechenden Disziplinen
  • Bauteilfertigung ausschließlich in eigenen Werken in Deutschland
  • Synergien mit anderen Geschäftsbereichen, wie z. B. 
  • Verkürzte Bauzeit durch Witterungsunabhängigkeit und Vorproduktion
  • Flexibles System für individuelle Bedürfnisse
  • Mehr als 90 Jahre Erfahrung in der Baubranche
Vorteile des Generalunternehmens Bögl