Top performance with concrete elements

29.07.2019

Wind power towers are the supporting pillars of every wind turbine. They are subjected to great forces during wind power generation and absorb the resulting vibrations via the foundation - a challenge for statics, materials and engineers. At the same time, the annual electricity yield increases by 0.5 to 1 percent with every meter that a wind turbine gains in height. In this respect, the principle often applies at inland locations: the higher the wind turbine, the better the wind shear and thus the yield.

Top performance with concrete elements

 

Concrete-steel combination ideal for large heights

The hybrid towers of Max Bögl Wind AG are ideally suited for wind harvests from a hub height of 140 m and above. The lower part of the towers consists of concrete elements with a steel tube tip at the top. Tubular steel towers of this size are no longer economical because the material and maintenance costs are very high at these heights. Max Bögl Wind AG relies on the concrete strength classes C80/95 to C100/115 for the hybrid towers of the second generation.

 

Concrete from our own house

Max Bögl Wind AG relies on limestone and blastfurnace slag flour from its own production for the formulation of the self-compacting concrete (SCC) used. Thanks to this mixture, it is already possible today to save up to 50 percent of the cement content compared to earlier recipes. An in-house research and development department is working on further increasing the savings potential in the future. In addition to cost savings, the incentive behind this is CO2 reduction in cement production - and thus an even more active contribution to climate protection.

 


Photo: Max Bögl Group

 

Optimized in all areas

In addition to the actual tower concept, the engineers at Max Bögl Wind AG have also optimized the tower foundation, assembly, logistics and interior fittings of the hybrid towers 2.0. The new foundation design simplifies prestressing at the entrance level of the wind turbine and thus streamlines work processes. The horizontal line of the concrete segments, machined with a CNC concrete grinding plant, does not require mortar or adhesive when erecting the hybrid tower. The individual concrete elements can now be transported with standard trailers. Costly heavy transports are completely eliminated. The interior work is carried out using a new patented process: Lift and ladder are installed during the construction of the concrete tower.

 

Excellent and globally successful product

Hybrid towers are also being built in German factory quality far away from home. This is made possible by the innovative Mobile Manufacturing concept. In four halls on an area of 40,000 m² - the equivalent of ten football pitches - all production facilities are accommodated similar to the factory production. Local raw materials and manpower increase the profitability of the project, fewer heavy goods transports protect the infrastructure, the climate and the environment. In Thailand, the first mobile manufacturing project has now been successfully completed. Max Bögl Wind AG erected 90 wind power towers for the Wind farm Thepharak with hub heights of 156.5 m each. The company also won the bauma Innovation Award 2019 in the construction process category for its Mobile Manufacturing division.

 

Advantages of the Hybrid Tower 2.0

  • Tested and proven technology
  • Economical solution made of steel and concrete
  • Maintenance-free concrete tower
  • Transport with standard trailer
  • Short delivery and installation time
  • Local production with mobile manufacturing
  • Long service life of the concrete tower
  • Easy demolition and reusability of the concrete tower segments

 

Lean Management ist für Max Bögl mehr als eine Methode. Denn Ziel ist es, die Unternehmensphilosophie nachhaltig zu verändern und eine lernende Organisation mit einer Lean-Kultur zu schaffen. Im Rahmen der Philosophie werden Verhaltensgrundsätze wie Veränderungs-, Werte- und Fehlerkultur bedingt und gefördert. Als Leitplanken auf unserem Weg zum schlanken Bauunternehmen dienen die Lean-Prinzipien. Die Verwirklichung der Lean-Prinzipien erfolgt durch die Methoden und Werkzeuge, die unseren Mitarbeitern als Handwerkszeug zur täglichen Umsetzung dienen.

Ein entscheidender Faktor auf dem Weg zum schlanken Bauunternehmen sind die Mitarbeiterinnen und Mitarbeiter der Firmengruppe, da sie als Experten an ihrem Arbeitsplatz eine wichtige Rolle zur Veränderung einnehmen. Um sie auf die kommenden Veränderungen vorzubereiten und ihnen die nötigen Kenntnisse zu vermitteln, wurde die maxlean Akademie gegründet. Ziel ist es, mit dem vierstufigen Schulungskonzept unsere Kollegen mit den für sie nötigen Inhalten auszubilden. Hierbei werden sie mit Schulungen, aber auch durch Coachings vor Ort unterstützt und sollen so die Lean-Kultur kennenlernen und in ihrer täglichen Arbeit anwenden. Die Schulungen werden mit Simulationen gestützt, um die gelernte Theorie anhand des praktischen Beispiels zu intensivieren. Hierbei sind die Lerninhalte wie auch der Praxisteil auf die Tätigkeitsfelder unserer Kollegen abgestimmt, um so den Übertrag in den Arbeitsalltag zu erleichtern. Die Umsetzung und das Coaching vor Ort erfolgen durch die aufgebaute Lean-Struktur in den jeweiligen Fachbereichen.

maxlean begrenzt sich nicht nur auf einen Bereich unseres Unternehmens. Ganz im Gegenteil, Lean ist als ganzheitlicher Ansatz zu verstehen, der unsere gesamte Wertschöpfungskette optimiert. Wir in der Firmengruppe Max Bögl sehen Lean Management nicht als begrenzt, sondern in unsere Gesamtstrategie Fortschritt 4.0 integriert. Hierbei betrachten wir sowohl die Produktion und die Baustelle als auch die Logistik und die administrativen Bereiche, um unseren Kunden die gewünschte Leistung zu bieten.

Diese Webseite verwendet Cookies. Indem Sie unsere Webseite nutzen, stimmen Sie der Verwendung von Cookies zu. Mehr erfahren ...