4,000 employees under one roof

With the W&W Campus into the future.

The new construction of a modern campus as a common, connecting place for all companies and visitors of the Wüstenrot & Württembergische Group (W&W) is an expression of the unity of the traditional companies Wüstenrot and Württembergische. By 2023, seven office buildings are to be loosely grouped around the campus at the Kornwestheim location, consisting of terraces, squares and arcades with restaurants, cafés, training and conference rooms. Around 1,200 employees have now moved into the first construction phase.

4,000 employees under one roof

Almost two and a half years after construction began in July 2015, the employees of Baden-Württemberg's largest independent financial services provider started working at modern, sustainable workplaces at the beginning of 2018. They will be accommodated in two new office buildings including a computer center with 32,000 square meters of gross floor space on the former parking lot of the W&W Group. The first campus section of the new corporate headquarters will be supplemented by two new multi-storey car parks with a total of around 880 parking spaces for cars and 110 for bicycles.

news 2018 ww campus 02 max boegl

Transparent working environment with residential character

W&W AG commissioned the Max Bögl group of companies in a joint venture with the construction companies WOLFF & MÜLLER and GWI with the turnkey construction of the new office buildings and the construction of the facade cladding for the multi-storey car parks and outdoor facilities. The façade made of 650,000 clinker bricks is characteristic of the approximately 28 metre high, room-high glazed office buildings. The interior of the six- and seven-storey new buildings is also of the highest architectural concrete quality. The two multi-storey car parks with their almost 7,000 square metres of prefabricated façades were constructed using prefabricated construction methods. The shell of the computer centre housed in the basement of the eastern office building was handed over to general contractor IBM on schedule in August 2016 and was ready for occupation with all computers by mid-2017.

news 2018 ww campus 03 max boegl

Seven office buildings in two construction phases

Now that the first construction phase has been completed, demolition of the old buildings on the W&W Kornwestheim site is to begin this year and construction of the buildings in the second phase will begin in spring 2019. By 2023, this will provide a total of five further office buildings with 2,800 workplaces - based on the standard floor plans of the campus building units according to plans by the architecture firm Ortner & Ortner Baukunst. Then the buildings, loosened up by squares, staircases and terraces, will be grouped around a broad main axis with their own inner courtyards, to which communal facilities such as the central company restaurant, training and meeting rooms, sports and medical areas as well as a conference centre will be connected.

news 2018 ww campus 04 max boegl

Lean Management ist für Max Bögl mehr als eine Methode. Denn Ziel ist es, die Unternehmensphilosophie nachhaltig zu verändern und eine lernende Organisation mit einer Lean-Kultur zu schaffen. Im Rahmen der Philosophie werden Verhaltensgrundsätze wie Veränderungs-, Werte- und Fehlerkultur bedingt und gefördert. Als Leitplanken auf unserem Weg zum schlanken Bauunternehmen dienen die Lean-Prinzipien. Die Verwirklichung der Lean-Prinzipien erfolgt durch die Methoden und Werkzeuge, die unseren Mitarbeitern als Handwerkszeug zur täglichen Umsetzung dienen.

Ein entscheidender Faktor auf dem Weg zum schlanken Bauunternehmen sind die Mitarbeiterinnen und Mitarbeiter der Firmengruppe, da sie als Experten an ihrem Arbeitsplatz eine wichtige Rolle zur Veränderung einnehmen. Um sie auf die kommenden Veränderungen vorzubereiten und ihnen die nötigen Kenntnisse zu vermitteln, wurde die maxlean Akademie gegründet. Ziel ist es, mit dem vierstufigen Schulungskonzept unsere Kollegen mit den für sie nötigen Inhalten auszubilden. Hierbei werden sie mit Schulungen, aber auch durch Coachings vor Ort unterstützt und sollen so die Lean-Kultur kennenlernen und in ihrer täglichen Arbeit anwenden. Die Schulungen werden mit Simulationen gestützt, um die gelernte Theorie anhand des praktischen Beispiels zu intensivieren. Hierbei sind die Lerninhalte wie auch der Praxisteil auf die Tätigkeitsfelder unserer Kollegen abgestimmt, um so den Übertrag in den Arbeitsalltag zu erleichtern. Die Umsetzung und das Coaching vor Ort erfolgen durch die aufgebaute Lean-Struktur in den jeweiligen Fachbereichen.

maxlean begrenzt sich nicht nur auf einen Bereich unseres Unternehmens. Ganz im Gegenteil, Lean ist als ganzheitlicher Ansatz zu verstehen, der unsere gesamte Wertschöpfungskette optimiert. Wir in der Firmengruppe Max Bögl sehen Lean Management nicht als begrenzt, sondern in unsere Gesamtstrategie Fortschritt 4.0 integriert. Hierbei betrachten wir sowohl die Produktion und die Baustelle als auch die Logistik und die administrativen Bereiche, um unseren Kunden die gewünschte Leistung zu bieten.