New Lifting for Tunnel Oberstaufen

29.11.2017

Bigger, faster, safer.

Severe weathering, water ingress and frost damage in winter: After more than 160 years of operation, southern Bavaria's only railway tube, the Oberstaufen Tunnel, had to be completely renewed. In the 1980s, rehabilitation with shotcrete was to stop the impending decay. But the ravages of time continued to gnaw on the building. Now the tunnel builders of the Max Bögl Group gave the ailing patient a modern fresh cell cure.

New Lifting for Tunnel Oberstaufen

 

Built on behalf of King Ludwig II in 1853, it is still the only tunnel on the Munich-Lindau double-track railway line. However, due to water penetration and severe frost, icicles were repeatedly formed on the inner walls and on the tracks during the winter months, hindering rail traffic. In addition, the cross-section of the once 123 metre long tube was so narrow that trains could only travel slowly on the two closely adjacent tracks - at the end of the day at a maximum speed of 30 km/h. The railways were not able to travel at all.

news 2017 tunnel oberstaufen 02 max boegl

Massive conversion for more comfort

To ensure that double-decker trains and trains with tilting technology will also be able to pass through safely in future, Deutsche Bahn decided in 2016 to carry out a fundamental conversion and comprehensive renovation of the tunnel. The cross-section was increased to 70 square metres, a new reinforced concrete inner shell was installed and retaining walls were installed at the portals, which extend the existing tunnel at both ends by 16 and 20 metres respectively. In connection with the tunnel project, Deutsche Bahn also had 9.5 kilometres of track between Immenstadt and Oberstaufen renewed, a new bridge and several culverts built, four points installed in Oberstaufen station and the signalling technology adapted.

news 2017 tunnel oberstaufen 03 max boegl

Blasting through the mountain

The construction work began in April 2016, when Max Bögl's tunnel construction specialists used 3.5 tonnes of explosives to extend the tunnel by around 1.50 metres around its circumference, so that the distance between the tracks could be increased from 3.50 to 4.00 metres. In the course of the blasting operation, over 15,000 tonnes of rock had to be excavated and removed. Then the new pipe was lined with a waterproof reinforced concrete inner shell with a vaulted base. In addition to the widening, Deutsche Bahn had the railway tunnel extended to a total length of around 160 metres. This tunnel extension in conjunction with new retaining walls now provides sufficient protection against rockfall instead of the old tunnel portals. The line was opened to rail traffic at the end of 2016. Since then, the trains have been travelling through the new tunnel at a speed of 80 km/h. The new tunnel has been opened for traffic at the end of 2016.

news 2017 tunnel oberstaufen 05 max boegl

Zalety

Możliwości
Jako jedna z największych niemieckich firm budowlanych ze sprzedażą 2,0 miliardów euro, 6500 wysoko wykwalifikowanych pracowników i siedmioma własnymi zakładami, jesteśmy Państwa silnym partnerem - nawet w przypadku projektów wymagających dużej ilości zasobów.

Kompleksowo
Oferujemy zintegrowane rozwiązania konstrukcyjne z jednego źródła - od infrastruktury, poprzez budowę stanu surowego, aż do uruchomienia.

Know-how
Łączymy specjalistyczną wiedzę, tworząc zespoły ekspertów z różnych obszarów biznesowych specjalnie dla Państwa projektu.

Doświadczenie
Od momentu powstania w 1929 roku działamy aktywnie w branży budowlanej i dlatego możemy czerpać z bogatego doświadczenia.

Zalety

Bliskość do klienta
Dzięki 19 oddziałom w całych Niemczech i Polsce jesteśmy zawsze blisko Ciebie i w razie potrzeby szybko na miejscu.

Wkład własny
Nasze zakłady produkują rocznie 40 000 ton elementów stalowych i bezprecedensowe 900 000 ton prefabrykatów betonowych na nasze place budowy. Wkład do tego pochodzi z naszych własnych kamieniołomów oraz z wytwórni piasku i żwiru. Transport realizujemy własnym taborem liczącym ponad 300 samochodów ciężarowych.

Jakość
Gwarantujemy najwyższą jakość dzięki takim narzędziom, jak ustandaryzowane zarządzanie projektami, ale także dzięki niezależnej od pogody prefabrykacji komponentów z zachowaniem wysokich standardów procesowych.

Wszechstronność
Realizujemy najróżniejsze typy budynków. Potrzebujesz biurowca z parkingiem wielopoziomowym? Dla naszych ekspertów budowlanych to żaden problem.

Nasze referencje – Twoja inspiracja

blank

Ursensollen

Technologiezentrum Grammer

mehr Infos
blank

Nürnberg

Hotel- und Bürogebäude Tafelhof-Palais

mehr Infos
blank

Lyngby (DK)

Studentenwohnheim BaseCamp

mehr Infos
blank

Frankfurt

Messehalle 12

mehr Infos
blank

Erlangen

Bürogebäude Siemens Campus M1

mehr Infos
blank

Dresden

Wohn- und Gewerbequartier Güntzareal

mehr Infos

This website uses cookies. By using our website, you consent to the use of cookies.