High-speed route Berlin-Munich

20.04.2018

25 years for four hours.

Over ten billion euros in construction costs, 25 years of planning and construction time: With the opening of Europe's largest and most expensive rail project, the Berlin-Munich high-speed line, Germany has been moving closer together since the end of last year. Thanks to a record travel time of just under four hours, from city centre to city centre, Deutsche Bahn wants to inspire travellers and encourage them to change from airplanes to trains.

High-speed route Berlin-Munich

Germany's most modern high-speed line was officially opened on 8 December 2017 with two special trains travelling and a major ceremony in Berlin in the presence of Federal Chancellor Angela Merkel, Federal Minister Christian Schmidt and several heads of state governments. Exactly 623 kilometres (via Halle) and 652 kilometres (via Leipzig) lie between the main stations of the German capital and the Bavarian metropolis. The ICE Sprinter, which stops three times a day on its way only in Halle, Erfurt and Nuremberg, shortens the travel time by a third from six hours to 3:55 hours. By way of comparison, the regular ICE can cover the distance in 4:30 hours.

 

Closing the gap in the European high-speed rail network

With a top speed of up to 300 km/h, the ICEs are on the move on sections of the newly built sections. At the heart of the new section that has now gone into operation, a nearly 110 kilometer long section through Thuringia, 22 tunnels and 27 viaducts were built. In addition to the national advantages, this high-speed line also brings Europe's North and South a little closer: it is an important component of the Trans-European Transport Networks (TEN-T) and, thanks to a common train control system, will make it possible in future to travel across national borders without changing railcars and without intermediate stops.

Milestones for Max Bögl

Together with the new Nuremberg-Ingolstadt-Munich line, the transport project German Unity No. 8 (VDE 8) with the new construction and extension of the lines between Nuremberg, Erfurt, Halle, Leipzig and Berlin is a project of superlatives. In 1991, after the reunification of Germany, the Federal Government decided that the new turbo line should sustainably improve the rail connections for passenger and freight traffic. The Max Bögl Group also played a major role in the implementation of this infrastructure measure, providing difficult engineering, tunneling and civil engineering services for the following sections:

NBS Nürnberg-Ingolstadt, Los Nord (35 km) between Feucht and Greding:

  • Turnkey construction of the line section up to OK Rail incl.
  • Göggelsbuch tunnel (2,287 m) and open construction (1,330 m)
  • Construction of various earthworks and bridges
  • Ballastless track system Bögl

news 2018 schnellfahrstrecke berlin muenchen 02 max boegl

NBS Ebensfeld–Erfurt (107 km):

  • Tunnels: Finnetunnel (6,886 m), Silberberg (7,391 m), Brandkopf (1,494 m) and Lohmeberg (688 m)
  • Railway bridges over the Wohlrose valley and Schobsetal

news 2018 schnellfahrstrecke berlin muenchen 03 max boegl

NBS Ebensfeld-Erfurt, Erfurt-Ilmenau section (32.5 km):

  • Permanent way in slab track Bögl
  • Noise barriers system Bögl

news 2018 schnellfahrstrecke berlin muenchen 04 max boegl

NBS Nuremberg-Ebensfeld (infrastructure measures Bubenreuth)

  • Earthworks, substructure: 352,220 m³
  • Drainage: 8,124 m
  • Diffusers: 305 m
  • shafts: 261 pieces up to max. 8 m depth
  • Provisional platforms: 1,200 m²
  • Overpasses: 13,000 m³ concrete, 10,000 m drilled piles, 7,000 m² sheet piles

Zalety

Możliwości
Jako jedna z największych niemieckich firm budowlanych ze sprzedażą 2,0 miliardów euro, 6500 wysoko wykwalifikowanych pracowników i siedmioma własnymi zakładami, jesteśmy Państwa silnym partnerem - nawet w przypadku projektów wymagających dużej ilości zasobów.

Kompleksowo
Oferujemy zintegrowane rozwiązania konstrukcyjne z jednego źródła - od infrastruktury, poprzez budowę stanu surowego, aż do uruchomienia.

Know-how
Łączymy specjalistyczną wiedzę, tworząc zespoły ekspertów z różnych obszarów biznesowych specjalnie dla Państwa projektu.

Doświadczenie
Od momentu powstania w 1929 roku działamy aktywnie w branży budowlanej i dlatego możemy czerpać z bogatego doświadczenia.

Zalety

Bliskość do klienta
Dzięki 19 oddziałom w całych Niemczech i Polsce jesteśmy zawsze blisko Ciebie i w razie potrzeby szybko na miejscu.

Wkład własny
Nasze zakłady produkują rocznie 40 000 ton elementów stalowych i bezprecedensowe 900 000 ton prefabrykatów betonowych na nasze place budowy. Wkład do tego pochodzi z naszych własnych kamieniołomów oraz z wytwórni piasku i żwiru. Transport realizujemy własnym taborem liczącym ponad 300 samochodów ciężarowych.

Jakość
Gwarantujemy najwyższą jakość dzięki takim narzędziom, jak ustandaryzowane zarządzanie projektami, ale także dzięki niezależnej od pogody prefabrykacji komponentów z zachowaniem wysokich standardów procesowych.

Wszechstronność
Realizujemy najróżniejsze typy budynków. Potrzebujesz biurowca z parkingiem wielopoziomowym? Dla naszych ekspertów budowlanych to żaden problem.

Nasze referencje – Twoja inspiracja

blank

Ursensollen

Technologiezentrum Grammer

mehr Infos
blank

Nürnberg

Hotel- und Bürogebäude Tafelhof-Palais

mehr Infos
blank

Lyngby (DK)

Studentenwohnheim BaseCamp

mehr Infos
blank

Frankfurt

Messehalle 12

mehr Infos
blank

Erlangen

Bürogebäude Siemens Campus M1

mehr Infos
blank

Dresden

Wohn- und Gewerbequartier Güntzareal

mehr Infos

This website uses cookies. By using our website, you consent to the use of cookies.