Modern hall construction with system

The logistics sector is booming. On the one hand, the increasing networking of the world under the guise of globalisation and the constantly growing trend towards online shopping with ever shorter delivery times demand advanced logistics solutions. On the other hand, many companies - from classic medium-sized companies to large international corporations - are investing in their production locations due to low interest rates and increasing economic growth. These market dynamics lead to a demand for hall buildings that can be designed as flexibly as possible, with short construction times and high quality combined with economic efficiency. It is precisely this demand that Max Bögl meets with its specially developed hall system.

Modern hall construction with system

Win-win situation for customers and Max Bögl

The Max Bögl Group has continued to focus on the construction of halls and is positioning itself even more broadly with several regional system construction locations. In addition to pure construction services with existing implementation planning, customers also receive advice and planning for all project phases on request. With the experts from Max Bögl, customers can now configure their hall individually and adapt it to their needs.

 

Intelligent modular system

The construction of the hall buildings can be imagined as a modular system of individual building blocks. The respective components such as supports, beams or roof trusses always fit precisely into each other and can be connected and extended as required. In this way, new buildings are always created according to the customer's design requirements. This construction method is equally applicable for small and large real estate objects and is suitable for all hall types - whether production, trade, warehouse or logistics (with / without office units). The system is simply adapted.

 

Efficient process flows

news 2019 moderner hallenbau lenkeit max boegl
Klaus Lenkeit
Division Manager System Construction Bavaria
news 2019 moderner hallenbau probst max boegl
Alain Probst
Division Manager System Construction NRW

If customers from logistics, industry or other branches of industry want to plan and build a hall, Max Bögl has established seven process steps for this. The individual steps could also be adapted to the individual needs of the customers, according to Klaus Lenkeit, Head of the Systems Construction Division Bavaria, and Alain Probst, Head of the Systems Construction Division NRW. Both experienced managers have recently joined the Max Bögl Group's hall construction team.

 

In seven steps to your dream property

 

The Max Bögl hall system - A look behind the development process

 

Andreas Meyer
Head of Technical Services System Construction

If the term "system" is considered more globally, it comes from the ancient Greek word "sýstēma", which means "a whole composed and structured of several parts". According to Andreas Meyer, Head of Technical Services System Construction, all systems have one thing in common: they bring structure into complex processes so that they are simplified, faster and more efficient.

As a key driver of the development process at Max Bögl, Andreas Meyer explains in an interview with "mbquadrat" how the group of companies adapted the principle of systemization to the construction of halls and developed the system hall.

 

 

news 2019 moderner hallenbau 03 max boegl
news 2019 moderner hallenbau 02 max boegl

 

Logistics centre in Oelde - Sample project for Max Bögl hall system

 

Oliver Aust
Central Division Leader System Construction North

A current reference project for systematic construction is the 125,000 square metre logistics centre in Oelde, which Max Bögl has been building for real estate developer Gazeley since January 2018. The property, which is located on the A 2 motorway, connects the Ruhr area with Hanover and northern Germany. By the time it is expected to be completed in August 2019, two months earlier than planned, around 5,500 precast elements from the Liebenau and Hamminkeln production plants will have been installed. According to Oliver Aust, Central Division Manager System Construction North, the construction project is characterized by three things in particular:

 

 

news 2019 moderner hallenbau 04 max boegl

Project data

  • Start of construction: 27.01.2018
  • Systematized precast elements: 5,500 pieces
  • Producing Max Bögl Works: Liebenau and Hamminkeln
  • Hall area: 125,000 m²
  • Office space: 10,000 m²
  • ceiling height: up to 20 m
  • Number of loading ramps: 56 pieces
  • Number of car parking spaces: 905 pieces
  • Completion: ahead. August 2019

Synergie w koncernie

Dla nas budowanie wartości zaczyna się już na samym początku: Zakłady firmowe zaopatrywane są w surowce z własnych żwirowni, piaskowni i kamieniołomów Max Bögl, dzięki czemu prefabrykaty betonowe produkowane są z zachowaniem najwyższych standardów jakościowych. Nasza flota, składająca się m.in. z ponad 300 ciężarówek, stanowi niezawodny łącznik pomiędzy zakładami a placami budowy. Ponadto, dzięki własnemu doświadczeniu w zakresie budownictwa podziemnego, możemy również sami świadczyć usługi infrastrukturalne – nawet na wymagających podłożach. Wraz z naszymi kolegami z działu „Energie odnawialne” zapewniamy Państwa nieruchomościom zrównoważone i wydajne wyposażenie budynków – aż po neutralność energetyczną.

Nasi klienci odczuwają wymierne korzyści dzięki krótkim trasom i minimalnej liczbie osób odpowiedzialnych – podczas całego projektu do Państwa dyspozycji pozostaje jedna i ta sama osoba kontaktowa.

Synergie w koncernie

Przyszłość budownictwa

Nieustanne kwestionowanie status quo, stały rozwój i optymalizacje to najważniejsze priorytety Grupy Max Bögl. Dlatego też z determinacją rozwijamy i udoskonalamy takie aspekty jak BIM, Lean oraz standaryzowane zarządzanie projektami, aby móc realizować projekty z najwyższą wydajnością i przejrzystością. Konsekwentne stosowanie metod BIM umożliwia m.in. weryfikowanie procesów budowlanych i wykrywanie kolizji już na etapie zakupu. Dzięki temu można na przykład sprawdzić, czy zaplanowana przestrzeń przy instalacji wentylacyjnej jest wystarczająca do przeprowadzenia wymiany filtra w późniejszym okresie eksploatacji.

Bezpieczeństwo pracy również odgrywa istotną rolę w optymalizacji naszych procesów przy pomocy narzędzi Lean. Jako osobny punkt w naszej specjalnie opracowanej matrycy maxpoint, kwestia ta jest codziennie szczegółowo omawiana i analizowana na placach budowy w dialogu ze wszystkimi uczestnikami procesu budowy. To szczególne wyczulenie naszych pracowników na kwestie bezpieczeństwa znajduje również odzwierciedlenie w liczbach. Przykładowo, centrum logistyczne o powierzchni 19 boisk piłkarskich zdołaliśmy wybudować w ciągu zaledwie 18 miesięcy – i to bez żadnego wypadku w ciągu około 500 000 godzin pracy.

Przyszłość budownictwa