General renovation of Munich grammar schools

13.06.2019

Venerable, but in need of restoration.

The growing population, full-day care and the reintroduction of the G9 at the grammar schools prompted the City of Munich to launch an extensive expansion programme until 2030 as part of the school construction offensive. In addition to new buildings of various school types, educational institutions must also be repaired and expanded.

General renovation of Munich grammar schools

 

Close to Münchner Freiheit in the Schwabing district, the state capital is planning the general overhaul and expansion of the Oskar-von-Miller-Gymnasium and the Maximiliansgymnasium. Both were built before World War I and share a horseshoe-shaped building complex. After the Second World War, the venerable school building had to be rebuilt and comprehensively renovated at the end of the 1970s.

 

Building in historical ambience

While preserving the historical building fabric, the technical building equipment and the entire static load-bearing system of the listed existing building will be renewed over the next four years. The challenges include the replacement of ceilings, the installation of a new roof construction and the strengthening of the foundation by underpinning. In addition, the inner courtyard will be put to maximum use by installing an underground gymnasium and an extension building as a specialist class wing.

 

news 2019 sanierung muenchen 02 max boegl
Photo: Michael Stibitz

 

Complex shoring works

As technical leader in Arge, the Max Bögl Group was commissioned with extensive special civil engineering, drainage and earthworks. The main trades are jet grouting and large bored pile work. A back-anchored excavation pit with bracing base in the former gymnasium is being constructed by means of jet blasting for the new construction of an underground ventilation centre. This technology will also be used to underpin the strip foundations of the building wings and the head structures of both grammar schools. The new gymnasium and extension buildings will be constructed in excavation pits surrounded by simply back-anchored, overlapping pile walls. The existing groundwater levels, in conjunction with the depth of the gymnasium, require a lift protection with micropiles and a lowering of the groundwater level.

 

Three-layer excavation pit

Progressive explosive ordnance soundings, additional temporary steel girder structures with wood infill, low-pressure injection work and various steel girder frames are to be integrated into the work process. The special civil engineering works are supplemented by the excavation of the three-layer subsoil from filling, quaternary gravel as well as tertiary clays/slides and sands. After thorough analysis, the excavated material is sent to a qualified, proven disposal facility. The construction period for the complex remediation work extends from September 2018 to November 2020 - with a core construction period between October 2018 and May 2020.

 

Holistyczne rozwiązania

Oprócz samych prac budowlanych w halach z istniejącym projektem wykonawczym, Max Bögl oferuje również doradztwo i planowanie we wszystkich fazach projektu. Z naszymi ekspertami możecie Państwo indywidualnie skonfigurować swoją halę i dostosować ją do swoich potrzeb.

  • Analiza potrzeb
  • Projekt koncepcyjny
  • Projekt wykonawczy
  • Oferta
  • Podpisanie kontraktu
  • Rozpoczęcie budowy
  • Ukończenie projektu
Holistyczne rozwiązania

Usystematyzowane budownictwo. Wszechstronne kreowanie

Grupa Max Bögl opracowała system dla nieruchomości komercyjnych, który pozwala zaoszczędzić czas i pieniądze, a jednocześnie pozostawia wystarczającą swobodę dla indywidualnych wymagań. Budowa konstrukcji hal odbywa się poprzez elastyczny montaż różnych elementów z systemu modułowego.

Poszczególne elementy - takie jak podpory, belki lub więźby dachowe - zawsze dokładnie do siebie pasują i można je dowolnie łączyć i rozbudowywać. Realizacja nieruchomości wielokondygnacyjnych również nie stanowi problemu.

Grupa firm Max Bögl świadczy wszystkie usługi związane z budową Państwa nieruchomości komercyjnej: od wizualizacji Państwa wizji, poprzez szczegółowe planowanie, aż po budowę nieruchomości pod klucz - wszystko z jednego źródła i wyprodukowane zgodnie z najwyższymi standardami.

Usystematyzowane budownictwo. Wszechstronne kreowanie

Zalety hal w systemie Bögl

Nasze referencje – Twoja inspiracja

blank

Kiekebusch

Logistikzentrum Septima

mehr Infos
blank

Kelsterbach

Logistikzentrum Immogate

mehr Infos
blank

Oelde

Logistikzentrum Gazeley

mehr Infos
blank

Mannheim

Schwerlastverladehalle Kübler

mehr Infos
blank

Gera

Produktionshalle Stahlo

mehr Infos
blank

Poing

Logistikzentrum Schustermann & Borenstein

mehr Infos

This website uses cookies. By using our website, you consent to the use of cookies.